About Lacus Paraguay

We have extensive experience in the industrial/business sector providing efficient solutions and the best alternatives in our field.

2743,34 MVA

We have 2,743.34 MVA installed.

Test protocol with the following characteristics:
– Plate data.
– Transformer ratio test.
– Insulation resistance test.
– Winding resistance test and loss tests (no-load and load).

Works performed

Learn about some of the works performed by our company under the highest quality standards in the industry.

In addition to our goal of after-sales assistance, we offer training courses to our customers

This course is open to all engineers and technicians whose companies currently use PLS-CADD or PLS-TOWER or are considering the purchase of either of these programs. Attendees should have a basic understanding of the concepts used in overhead transmission line design and/or structural design.

This course is focused on the use of the programs and not on the fundamentals of transmission line design.

The purpose of this course is to limit the presence of the fire risk and the circumstances that can trigger the fire and to control or fight the fire, to extinguish it, and minimize the damages or losses that it can generate.

At the end of the course, participants will be able to know the different types of electrical substations and their diagrams. Learn the functionality of electrical substations and subsequently develop electrical substation engineering projects.

Participants of this course will develop the knowledge and practical skills necessary to approach electrical substation automation projects from the IEC 61850 standard.

Contact Form

    Address

    Asunción, Paraguay.

    Phone

    +595985202080

    Mail

    info@lacus.com.py

    EnglishSpain